The turnkey construction of the residential building was carried out. Total construction area: 16,017m².
The excavation, underpinning, HA structure, masonry and finishes were carried out.
The reinforced concrete structure of two 48 and 49 floor towers was built, masonry tasks, finishes and electrical installations. Total 40,000m².
Construction of residences, offices, commercial-gastronomy building. The groundwater depression system, excavation, demolition, intramural partitions and their anchorages were carried out.
The construction of the 29-story building, soil movement, reinforced concrete structure, installations, and masonry was carried out. Total of 30,000m².
A hotel and residences were built. The project consisted of two 32-story residential towers and a hotel with 60 suites. Cisterns, pools, enclosures and tanks in the basement were built with insulation for a total of 1760 m3 of concrete.
The movements of soils, buttresses and temporary structure necessary for demolition, support anchors in subsoils, wet work-installations, concrete structure, masonry, partitions, plaster, insulation, coatings, sanitary installations, electrical installations, installations and metallic carpentry were carried out.
The complex was built, undertaking the role of main contractor. The demolition, soil movements, reinforced concrete structure, masonry, construction of tanks and concrete structure enclosure with waterproofing were carried out.
Main contractor of Zaha Hadid’s 1st venture in Latin America. 33 floors and 5 basements building. 90 units – 192 indoor garages. The demolition, excavation, foundations, structures, waterproofing, protections, installations, carpentry and railings were carried out. Floors and ceilings.
Main contractor of the project. Excavation, soil movement, subsoil resistant structure, building resistant structure, masonry, groundwater depression system and grounding.