The Ezeiza RA-10 Atomic Reactor was built, intended to increase the production of radioisotopes for medicinal purposes. The work included the main building, with a special concrete structure, neutron guide buildings, auxiliary buildings, cooling towers, fire hydrant and reserves.
A new delayed coker plant was built at the Campana refinery. Civil works were carried out in the new FGT (Fuel gas treatment) unit and in the DHT (Diesel Hydro treatment) plant.
Turnkey execution of the Lujan de Cuyo Thermal Power Plant discharge, in the province of Mendoza.