The historic theater was remodeled and updated, on a turnkey basis.
The former “Fish Market” was remodeled, with an area of 12,000m², to transform it into the Metropolitan Design Center (CMD).
The expansion of classrooms was carried out.
A 4,400m² housing building was built for students coming from the provinces and other countries.
Partial demolition and new reinforced concrete structures were carried out at Dock 12, Dock 2, in Puerto Madero. The façades were updated and the carpentry was installed.
The 2,800 m² library and the first stage of the 5,800 m² classroom pavilions No. 3 and 4 were built.
The building of the old Italo-Argentine Electricity Company plant in La Boca was remodeled to transform it into a concert hall, and it is the headquarters of the Buenos Aires Philharmonic Orchestra.