Aeropuertos Argentina 2000
Ministro Pistarini Ezeiza Airport - New Terminal B

The new Terminal B, of 50,000 m², located in Ministro Pistarini International Airport, makes possible to speed up the number of flights departing from the country. Due to its futuristic appearance it was baptized “Zeppelin”.

More than 2,500 direct and indirect jobs during its construction.
100% renewable energy supply.
Capacity to process 30 million passengers per year.
50,000m2 of new terminal, 230m long and 45m high.
2000m2 of Migrations area located in the building inside the terminal (Zeppelin).
2000m2 of PSA airport control area located in the building inside the terminal (Zeppelin).
5 Check-in islands with 150 specially designed counters.
2,250 meters of baggage conveyor belts.

10 baggage carousels.
2550 total tons of metallic structure.
380 tons of glass (2,178 units for the Zeppelin located inside the terminal).

60% savings in energy consumption.

Barugel Azulay
Barugel Azulay

Construction of offices and store.

Óptima Business Park
Óptima Business Park

The concrete structure, masonry, foundations and additional sanitary installations for a 40,000m² office building were built.

Edificio Intecons
Intecons Building

The construction of the concrete structure, masonry, installations, for the 35,000m² office building was carried out.

Torre Consultatio (BBVA)
BBVA Bank Consultatio Tower

The demolition, soil movement, reinforced concrete, construction of enclosures, cisterns and tanks were carried out. Masonry and carpentry.

SC Johnson - Proyecto Tango
SC Johnson

All the work for the 10,169.84 covered m² was carried out, while the remaining 1,744.83 m² correspond to semi-covered sectors and the central courtyard.

Banco Galicia Green Tower
Galicia Green Tower Bank

All the work was carried out. Construction of reinforced concrete structure, masonry, insulation, carpentry, finishing, sanitary installations and fire system.

Torre Banco Macro
Macro Bank Tower

The demolition, soil movement, and groundwater depression system were carried out. Afterwards, the new reinforced concrete structures, cisterns, enclosures and tanks were built.

Coca Cola New Building
Coca Cola New Building

The excavation, intramurals, concrete work and masonry were carried out. The building achieved the LEED platinum certification.

Reactor Multipropósito RA-10
Multipurpose Reactor RA-10

The Ezeiza RA-10 Atomic Reactor was built, intended to increase the production of radioisotopes for medicinal purposes. The work included the main building, with a special concrete structure, neutron guide buildings, auxiliary buildings, cooling towers, fire hydrant and reserves.